Sustainable Survival Pyramid Model to Balance Four Factors of Cost, Quality, Risk and Time Limitation in Project Management under Uncertainty
Yükleniyor...
Tarih
2020
Yazarlar
Dergi Başlığı
Dergi ISSN
Cilt Başlığı
Yayıncı
UNIV PUNJAB, INST GEOL, QUID-E-AZAM CAMPUS, PO BOX NO 54590, LAHORE 00000, PAKISTAN
Erişim Hakkı
info:eu-repo/semantics/openAccess
Attribution-NonCommercial-NoDerivs 3.0 United States
Attribution-NonCommercial-NoDerivs 3.0 United States
Özet
The final agreement on the timing of project completion is one of the obvious problems between project managers and their clients. There have been numerous reports of customers requesting shorter completion times than previously announced. This request will affect the three project factors of overall cost, final quality of the project, and risk of implementation. This paper proposes a multipurpose cumulative complex linear programming to minimize "project overhead," "increase projects total risk" and "increase overall project quality" due to “time constraints." In other words, the proposed study is fully implemented among the four goals mentioned to shorten the project duration. Computational experiments have also been used to evaluate the performance of the proposed model. The main objective of this paper is to optimize the integration of the four factors of the survival pyramid (time, cost, quality, and risk) in industrial projects simultaneously under uncertainty. An innovative solution approach based on the multi-objective genetic algorithm (NSGA-II) is presented. This model is then used to solve a problem in another study and its results, strengths, and weaknesses compared to the previous model are evaluated. The results show the performance of the proposed model in all four factors is better than the previous models.
Açıklama
Anahtar Kelimeler
Sustainable decision making, Model development, NSGA-II, Survival pyramid
Kaynak
Pakistan Journal of Statistics and Operation Research
WoS Q Değeri
N/A
Scopus Q Değeri
Q2
Cilt
16
Sayı
2